audio by title tunnel-street

Tunnel - Street

start:
reverberant corridor, footsteps, chatter etc
end:
street

1:05 minutes (1.49 MB)

Sat 12.5.07, Helsinki, around 3 pm. A transition from a reverberant corridor (footsteps, chatter etc) to the street.

Back to top